1300 761 506

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Recommendation - Paul

  Judy and Ray
 
Thank you both for your help on a number of issues regarding the property me and my wife will now be buying. Just to let you know, we did manage to get a price reduction on the property, albeit $1000 (not the full amount but all helps in the end).

 
The contract went unconditional last Monday and settlement is due for March 20. We already have renovation plans in mind, but needed to speak to Terry (Structural Engineer) regarding whether we could remove some walls (unsure if they were load bearing).
 
Thanks again and we will be sure to recommend you down the track.
 
Cheers


Paul

  • Useful tips
  • Downlight cover on electrical wiring
    "Possible electrocution if the metal down light covers sitting on the electrical cable are forced down & come into contact with a live power."
  • Dimmers
    "Dimmers may shorten compact fluorescent lamps"
  • Rafter repair on New Home
    "The rafters of this new home had been damaged and poorly repaired."
get a quote
Master Builders HIA

© Copyright Pro-Check Building Services Pty Ltd 2008 | Developed by ADICD