1300 761 506

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Wind Bracing

Wind bracing design has been compromised due to the bracing being cut.
The original complianced wind bracing design has been compromised when the installers of the sky light cut the bracing.
A truss manufacturer's representitive will need to inspect and design a method of rectification so that roof wind loadings are adequate.
    What Our Clients Say
  • New House Inspection
    "Happy with the service and report"
  • Building inspection beyond expectation
    "The service was beyond expectation"
  • Jodie Building inpsection
    "Thank you for the concise, honest inspection."
get a quote